As Noozhawk reported, the Buellton City Council is currently reviewing a prominent proposal put forward regarding the local transportation network to reduce Highway 246 from four lanes to two lanes. The municipal initiative, which focuses heavily on local traffic modifications and safety enhancements, features a draft plan that has officially reached sixty percent completion. This comprehensive draft plan was formally presented to municipal leaders by Public Works Director Rose Hess.
The physical scope of the planned roadway project spans a specific geographic section, stretching precisely from Riverview Drive to the Avenue of Flags. To bring the design phase to its current status, the city relied upon the professional services of the engineering firm Tetra Tech. The engineering firm Tetra Tech prepared the primary draft plan that outlines how the transition from four lanes down to two lanes will be structured along this targeted corridor.
Financing for the safety project is assembled through multiple funding streams secured by the municipal government. Specifically, the project is funded by one hundred thousand dollars in Measure A funds, combined with a four hundred thousand dollar local construction allocation. To fulfill the financial requirements for the infrastructure updates, the city is applying for seven hundred thousand dollars in state Highway Safety Improvement Program grants.
Administrative coordination regarding the highway modifications is also moving forward. As part of the ongoing preparations, city staff are scheduling important coordination efforts, including a planned meeting with official representatives from Caltrans in December. Following these administrative reviews and the finalization of the engineering work, construction on the Highway 246 project is hoped to begin next year.
Local motorists navigating the area will likely experience noticeable changes in how traffic moves through the corridor. Addressing the functional purpose of the lane reductions and the realities of neighborhood access, Public Works Director Rose Hess told Noozhawk, "Expect that you will have probably a little bit longer time waiting to make that turn out of the residential neighborhoods onto 246. That’s not what it’s designed for is to expedite that; it’s to make sure people slow down."
Furthermore, addressing the broader conditions that drivers must anticipate as the city transitions toward the construction phase of the safety project, Public Works Director Rose Hess told Noozhawk, "Expect traffic."


